Skip to main content
Plant portal

SharePoint Template for Manufacturing

Safety counter, OEE and shift communication on the factory floor.

Giant safety-days counter, plant hero, OEE and yield KPI cards, shift announcements and a video web part.

An AvantIT reference solution for Manufacturing: the starting point we adapt to your organisation and implement in your Microsoft 365 tenant.

Sector

Manufacturing

Demo brand
ForgeLine Manufacturing
Site type
Plant portal
Pages
4
Technology
SharePoint Online
Delivery
Tailored implementation
Demo

Explore the solution live

This is the real layout demo, with a fictional brand. Navigate between pages, open menus and test it at different screen sizes. During implementation, all of it is adapted to your organisation.

forgelinemanufacturing.sharepoint.com/sites/intranet

Navigation inside the demo is live: browse the news, department and contacts pages exactly as you would in SharePoint.

A SharePoint Online template for manufacturing plants. It combines a days-without-incident counter, OEE and yield indicators, shift announcements and training videos in a portal designed for shop floor screens.

Who It's For

  • Plant management and production leads
  • Shift supervisors and line teams
  • Quality, maintenance and workplace safety

What We Do

  • Giant days-without-incident counter, readable from a distance
  • KPI cards for OEE, yield and scrap
  • Shift announcements with handover notes
  • Video web part for training and best practice

Outcomes

  • Production indicators visible to every team, every shift
  • Documented shift handover instead of verbal only
  • Safety training reachable without leaving the station

Technologies

  • SharePoint Online
  • Microsoft 365
  • Viva Connections
  • Microsoft Teams

Region: Portugal (Porto, Lisbon) and Europe

Manufacturing challenges

This template covers the intranet. If you want the full sector picture — processes, integrations and cases — the Manufacturing solutions page covers that.

See Manufacturing solutions
Sections

What is included

Sections and web parts that make up this reference solution. During implementation we keep, adapt or add whatever makes sense for your organisation.

Giant days-without-incident counter, readable from a distance
KPI cards for OEE, yield and scrap
Shift announcements with handover notes
Video web part for training and best practice
Hero with plant photography and production milestones
Quick links to maintenance, PPE and quality
Audience

Who it was designed for

  • Plant management and production leads
  • Shift supervisors and line teams
  • Quality, maintenance and workplace safety
Impact

What changes after go-live

  • Production indicators visible to every team, every shift
  • Documented shift handover instead of verbal only
  • Safety training reachable without leaving the station
Customisation

Your brand, this layout

The layout you are viewing uses the fictional brand ForgeLine Manufacturing. During implementation we apply your company colours, typography, logo and photography, and adapt section names and navigation to your organisation.

  • Colours, typography and logo from your visual identity
  • Section names, departments and navigation tailored to you
  • Initial content prepared with your communications team
  • Published in your Microsoft 365 tenant, with data in the EU

Implemented in Portugal

AvantIT implements this intranet from Matosinhos, Porto, for clients nationwide and across Europe. On-site meetings in Greater Porto and Greater Lisbon, or fully remote.

PortoMatosinhosLisboaBragaAveiroCoimbra
Next steps

What happens next?

A short path with no surprises, from first contact to proposal.

  1. 01

    We learn your context

    An initial conversation to understand your goals, your teams and the current state of Microsoft 365 in your organisation.

  2. 02

    We present the solution

    We walk you through the Manufacturing template and what can be adapted: structure, sections, brand and integrations.

  3. 03

    We define the scope

    Together we identify what makes sense to implement: pages, content migration, permissions and integrations.

  4. 04

    We present a proposal

    Investment is defined according to the agreed scope. No commitment until then.

Want to see this solution in action?

Request a demo. We walk you through the Manufacturing template in the context of your organisation, answer your questions and, if it makes sense, scope the implementation together.

The template you are looking at is an AvantIT reference solution: a starting point, not a file to download. Implementation is tailored to your organisation's Microsoft 365 environment, with your brand, your structure and the scope that makes sense.

We use your details only to answer this enquiry. Privacy Policy

Would you rather pick a slot now? Book directly in the calendar

FAQ

Frequently asked questions

What does the SharePoint template for Manufacturing include?

It includes the intranet landing page plus three supporting pages (news, department and contacts), with giant days-without-incident counter, readable from a distance, kpi cards for oee, yield and scrap, shift announcements with handover notes and the remaining sections visible in the demo. Everything is built from native SharePoint Online web parts and adapted to your organisation during implementation.

Can I download or install this template directly?

No. This template is an AvantIT reference solution, not a downloadable file or a package to install. It is the starting point for an implementation project: our team adapts the structure, brand and content to your organisation and publishes the intranet in your Microsoft 365 tenant.

How much does it cost to implement this solution?

Implementation is an AvantIT service and the investment depends on scope: the number of sites and pages, the volume of content to migrate, integrations with other systems and the level of customisation. That is why there is no list price. After an initial conversation and scoping, we present a fixed proposal, with no commitment until then.

How long does implementation take?

An intranet based on a catalog reference solution usually has a first version live in about a week; with branding, migration of essential content and editor training, 2 to 4 weeks. A custom intranet, with several sites or more complex integrations, takes 6 to 12 weeks; the timeline is part of the proposal.

Can we display this page on shop floor screens?

Yes. The layout uses high-contrast blocks and large type for kiosk mode. We configure a dedicated device with a persistent session and page rotation, so operators never need to sign in individually.

Can we use this template with our own brand?

Yes, that is how it works. The example uses the fictional brand ForgeLine Manufacturing; during implementation we apply your colours, typography, logo and photography, and adapt sections and navigation to your organisation.

Catalog

Other templates you may like

Company intranet

Construction

GranitePoint Construction

Full-bleed hero, dark safety KPI counter band, news, document libraries, events and a hazard reporting CTA.

View template

Want this intranet for Manufacturing?

Book 30 minutes with our team. We show the solution with your brand and scope the implementation.