Construction
GranitePoint Construction
Full-bleed hero, dark safety KPI counter band, news, document libraries, events and a hazard reporting CTA.
View templateSafety counter, OEE and shift communication on the factory floor.
Giant safety-days counter, plant hero, OEE and yield KPI cards, shift announcements and a video web part.
Sector
Manufacturing
This is the real layout demo, with a fictional brand. Navigate between pages, open menus and test it at different screen sizes.
Navigation inside the demo is live: browse the news, department and contacts pages exactly as you would in SharePoint.
A SharePoint Online template for manufacturing plants. It combines a days-without-incident counter, OEE and yield indicators, shift announcements and training videos in a portal designed for shop floor screens.
Region: Portugal (Porto, Lisbon) and Europe
Sections and web parts that make up this SharePoint landing page.
Every template ships with the landing page plus three supporting pages, already wired into the navigation.
The layout you are viewing uses the fictional brand ForgeLine Manufacturing. During implementation we apply your company colours, typography, logo and photography, and adapt section names and navigation to your organisation.
AvantIT implements this intranet from Matosinhos, Porto, for clients nationwide and across Europe. On-site meetings in Greater Porto and Greater Lisbon, or fully remote.
It includes the intranet landing page plus three supporting pages (news, department and contacts), with giant days-without-incident counter, readable from a distance, kpi cards for oee, yield and scrap, shift announcements with handover notes and the remaining sections visible in the demo. Everything is built from native SharePoint Online web parts.
Yes. The example uses the fictional brand ForgeLine Manufacturing; during implementation we apply your colours, typography, logo and photography, and adapt sections and navigation to your organisation.
Yes. The layout uses high-contrast blocks and large type for kiosk mode. We configure a dedicated device with a persistent session and page rotation, so operators never need to sign in individually.
An intranet based on a catalog template goes live in 2 to 4 weeks. Investment depends on the number of sites, the volume of content to migrate and the integrations needed — we send a fixed proposal after a 30-minute scoping session.
GranitePoint Construction
Full-bleed hero, dark safety KPI counter band, news, document libraries, events and a hazard reporting CTA.
View templateSwiftHaul Logistics
Live-ops KPI ticker band, expansion hero, weather advisory panel, news and a driver referral CTA.
View templateVoltEdge Energy
Full-width milestone hero, KPI cards, an HSE moment quote panel, news and events.
View templateBook 30 minutes with our team. We show the template with your brand and scope the implementation.